Legit Pages

File No. 8Kind ChecklistChecked Sources 15

Before You Hire an Electrician in California

Check two things, not one. The company needs an active C-10 license with CSLB.3 The people it sends to wire your home need a state electrician certificate, unless an exemption applies.5

$1,000Job value from which a CSLB license is required2
$25,000Contractor license bond on file with CSLB7
100 VACertification does not apply to connections below this size4
5State electrician certificate types5

Checklist

  1. Look up the license number. Every contractor ad must show the state license number.1 Check its status online at cslb.ca.gov or by calling (800) 321-CSLB (2752).1 A printed number does not prove the license is valid.1 See reading a CSLB license record.
  2. Match the classification to the job. A C-10 Electrical contractor installs or connects wiring, fixtures, raceways, battery storage and solar systems.3 If your project mixes more than two trades, such as a kitchen with plumbing, electrical and carpentry, CSLB points to a "B" General Building contractor.2 See California license classifications.
  3. Check the bond and workers' compensation. A license requires a $25,000 contractor bond on file.7 A contractor with employees must carry workers' compensation insurance.1 If that coverage lapses, the license is suspended automatically.8 Both appear on the CSLB record.1 See contractor bonds and workers' comp on a license.
  4. Ask who will do the wiring. People who work as electricians for a C-10 contractor must be state-certified.5 The license's qualifying person does not need a certificate.5 Registered apprentices are exempt.5 Trainees may work only under constant supervision of a certified electrician.6 The Labor Commissioner publishes lists of certified electricians and trainees.6
  5. Agree who gets the permit. CSLB advises asking your local building department whether the project needs a permit.11 In San Diego, no wiring or equipment may be installed or altered without an Electrical Permit, except listed exemptions.9 CSLB asks whether the contract requires the contractor to get permits before work starts, and whether fees are included.11
  6. Get a written contract. Work over $500 needs a written home improvement contract.12 The down payment may not exceed $1,000 or 10 percent of the price, whichever is less.12 Details are in what a California home improvement contract must say.
  7. Watch for red flags. CSLB's list is below. If someone pressures you to skip the checks above, stop.

The state certification rule

Electrician certification is in Labor Code sections 108 to 108.5. These sections replaced former sections 3099 to 3099.5, and old references now point to them.4 The Division of Labor Standards Enforcement runs testing and certification.4

"Electricians" here means people who connect electrical devices for C-10 contractors. The rule does not apply to connections under 100 volt-amperes.4 It also does not apply to work within a C-7 Low Voltage Systems or C-45 Electric Sign license.5

There are five certificates: general electrician, residential electrician, fire/life safety technician, voice data video technician, and nonresidential lighting technician.5 The general electrician exam requires 8,000 hours of on-the-job experience. The residential exam requires 4,800 hours.13

A C-10 contractor who willfully employs uncertified people as electricians can face discipline, including suspension or revocation of the license.5 CSLB has enforced this law since July 1, 2009.6

Why it matters

The license belongs to the business. Certification belongs to each worker, and the law requires it of the worker.5 A license lookup checks the company; a certification card checks the person holding the tools. If neither employer nor worker can show proof of certification or trainee status, the law presumes a violation, subject to rebuttal.5

Permits: one city as an example

Permit rules differ by city and county. We use the City of San Diego as an example; check your own building department.

San Diego issues a Simple "No-Plan" Electrical Permit for minor installations.10 Examples include adding circuits, moving outlets, re-wiring and an EV charging station in a private garage.10 Applications go through the city's online permitting portal.9

Larger work needs plans and calculations.9 The city issues electrical permits only to a California-licensed contractor authorized for electrical work, or to the property owner or lessee.9 Once the permit is issued, an inspection can be scheduled.9

Questions to ask

Based on CSLB consumer guidance, Labor Code 108.2 and Business and Professions Code 7159.5 and 7159.10, read Oct 7, 2026
Question to askGood answer
What is your CSLB license number?A number that the CSLB lookup shows as active, with the C-10 classification for electrical work.1,3
May I see your pocket license and a photo ID?Yes, and the names match.1
Who will do the electrical work in my home?The license's qualifying person, or electricians with a state certificate they can show. Apprentices or trainees work under supervision.5,6
Do you have employees, and who is your workers' compensation carrier?A carrier name that matches the CSLB record, or "no employees" with the exemption shown there.1
Who pulls the permit, and is the fee in the price?The contractor, before work starts, with the fee stated in the contract.11
How much do you need before work starts?No more than $1,000 or 10 percent of the price, whichever is less, unless the CSLB record shows a blanket performance and payment bond.12,14
How do later payments follow the work?A written schedule, with each payment tied to work done or materials delivered.12
Is this a service and repair contract?Only if the price is $750 or less, you asked for the work, nothing extra is sold, and you pay after completion.12

Red flags CSLB names

If you paid someone who needed a license and did not have one, the law lets you sue to recover all you paid.15 See unlicensed contracting. For status, workers' comp and license age across all electrical licenses, see what the state file says about electricians.

Limits

CSLB's classification guide prints a note under the C-10 description. It says the regulation was amended in October 2024, but its effective date was stayed at the time of the guide's update.3 Check CSLB for the current scope before a battery storage or solar job.

Sources

  1. Contractors State License Board, "How do I find the right licensed contractor?", https://www.cslb.ca.gov/Consumers/Hire_A_Contractor/Finding_The_Right_Contractor.aspx, accessed Oct 7, 2026.
  2. Contractors State License Board, "What Kind of Contractor Do You Need?", https://www.cslb.ca.gov/Consumers/Hire_A_Contractor/What_Kind_Of_Contractor.aspx, accessed Oct 7, 2026.
  3. Contractors State License Board, "Description of Classifications" (PDF), C-10 Electrical (16 CCR 832.10), https://www.cslb.ca.gov/Resources/GuidesAndPublications/DescriptionClassifications_ENG0525_ADA.pdf, accessed Oct 7, 2026.
  4. California Legislature, Labor Code section 108, https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=108, accessed Oct 7, 2026.
  5. California Legislature, Labor Code section 108.2, https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=108.2, accessed Oct 7, 2026.
  6. California Department of Industrial Relations, Labor Commissioner's Office, "Electrician Certification FAQs" (page dated June 2026), https://www.dir.ca.gov/dlse/ecu/ECU_FAQ.htm, accessed Oct 7, 2026.
  7. California Legislature, Business and Professions Code section 7071.6, https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC&sectionNum=7071.6, accessed Oct 7, 2026.
  8. California Legislature, Business and Professions Code section 7125.2, https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC&sectionNum=7125.2, accessed Oct 7, 2026.
  9. City of San Diego, Development Services Department, "Electrical Permit", https://www.sandiego.gov/development-services/permits/electrical-permit, accessed Oct 7, 2026.
  10. City of San Diego, Development Services Department, "Simple (No-Plan) Electrical Permit", https://www.sandiego.gov/development-services/permits/electrical-permit/simple, accessed Oct 7, 2026.
  11. Contractors State License Board, "What Seniors Should Know Before Hiring a Contractor" (PDF, 13P-066/0125), https://www.cslb.ca.gov/Resources/GuidesAndPublications/WSSK_ENG0125_ADA.pdf, and "Step 3: Homeowner Checklists", https://www.cslb.ca.gov/Consumers/Hire_A_Contractor/Home_Improvement_Contracts/Homeowner_Checklists.aspx, accessed Oct 7, 2026.
  12. California Legislature, Business and Professions Code sections 7159, 7159.5 and 7159.10, https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC&sectionNum=7159, https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC&sectionNum=7159.5 and https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC&sectionNum=7159.10, accessed Oct 7, 2026.
  13. California Department of Industrial Relations, Labor Commissioner's Office, "Who needs to be certified to work in California as an electrician", https://www.dir.ca.gov/dlse/ecu/elecat.html, accessed Oct 7, 2026.
  14. Contractors State License Board, "10 Tips: Make Sure Your Contractor Measures Up" (PDF, 13P-075/0425), https://www.cslb.ca.gov/Resources/GuidesAndPublications/TenTipsCard_DUAL0425_ADA.pdf, accessed Oct 7, 2026.
  15. California Legislature, Business and Professions Code section 7031, https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC&sectionNum=7031, accessed Oct 7, 2026.